# Best Practices for PLC and SCADA Integration in Industrial Facilities

**URL:** <https://forum.inductiveautomation.com/t/best-practices-for-plc-and-scada-integration-in-industrial-facilities/116749>\
**Category:** Ignition\
**Tags:** ignition81\
**Created:** [August 11, 2026, 2:32pm UTC](https://forum.inductiveautomation.com/t/best-practices-for-plc-and-scada-integration-in-industrial-facilities/116749 "2026-08-11T14:32:19Z")\
**Posts on this page:** 1\
**Showing post:** 7

<div class="post-metadata">

**Author:** ![nminchin](https://sea1.discourse-cdn.com/inductiveautomation/user_avatar/forum.inductiveautomation.com/nminchin/32/6911_2.png) [@nminchin](https://forum.inductiveautomation.com/u/nminchin)\
**Post date:** [August 12, 2026, 11:55pm UTC](https://forum.inductiveautomation.com/t/best-practices-for-plc-and-scada-integration-in-industrial-facilities/116749/7 "2026-08-12T23:55:50Z")

</div>

This word document was produced by Claude (AI). I asked it to collate the best practices scraped from the forum back in March. It did a pretty good job, except that it created separate tables for each of the poor/better practices, and didn't size the comment columns well...  
The forum doesn't allow uploading docx so I had to zip it.

[Ignition\_Best\_Practices\_Guide.zip](https://forum.inductiveautomation.com/uploads/short-url/1NM9KKnVQAADTm3xFesI0YoW4xi.zip) (26.6 KB)

---

_[View the full topic](https://forum.inductiveautomation.com/t/best-practices-for-plc-and-scada-integration-in-industrial-facilities/116749)._
