# Gateway locks up when bulk removing/adding tags to project?

**URL:** <https://forum.inductiveautomation.com/t/gateway-locks-up-when-bulk-removing-adding-tags-to-project/72455>\
**Category:** Ignition\
**Created:** [April 14, 2023, 12:25pm UTC](https://forum.inductiveautomation.com/t/gateway-locks-up-when-bulk-removing-adding-tags-to-project/72455 "2023-04-14T12:25:56Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Kozlowlw](https://avatars.discourse-cdn.com/v4/letter/k/5e9695/32.png) [@Kozlowlw](https://forum.inductiveautomation.com/u/Kozlowlw)\
**Post date:** [April 14, 2023, 12:25pm UTC](https://forum.inductiveautomation.com/t/gateway-locks-up-when-bulk-removing-adding-tags-to-project/72455/1 "2023-04-14T12:25:57Z")

</div>

New to ignition and running into a problem with bulk editing tags.

We have ~800k tags on a dev server where people were just importing multiple PLCs Controller:Global tag structure from the OPC browser. I consolidated these down into ~5k tags per plc and I'm trying to remove the extras in designer without creating a new project but the gateway locks up if I delete more than ~1k tags at a time. After it locks up I have to restart the gateway which then discards any changes that have been made to the tags so I'm back where I started.

Anyone know a good way to reset the tags in a project?
