# How to move Sepasoft Production/Batch project to production gateway

**URL:** <https://forum.inductiveautomation.com/t/how-to-move-sepasoft-production-batch-project-to-production-gateway/106956>\
**Category:** Ignition\
**Tags:** sepasoft\
**Created:** [June 3, 2025, 2:15pm UTC](https://forum.inductiveautomation.com/t/how-to-move-sepasoft-production-batch-project-to-production-gateway/106956 "2025-06-03T14:15:29Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![AAC](https://avatars.discourse-cdn.com/v4/letter/a/a6a055/32.png) [@AAC](https://forum.inductiveautomation.com/u/AAC)\
**Post date:** [June 3, 2025, 2:15pm UTC](https://forum.inductiveautomation.com/t/how-to-move-sepasoft-production-batch-project-to-production-gateway/106956/1 "2025-06-03T14:15:29Z")

</div>

Hello everyone,

How can I move my Sepa Batch project from my engineering PC to the production gateway? I only use these Sepa modules (Production & Batch). I need to move it to the final workstation. I can't find anything about this in the documentation.

Thanks!!
