# Multiple pipelines for one tag

**URL:** <https://forum.inductiveautomation.com/t/multiple-pipelines-for-one-tag/42257>\
**Category:** Ignition\
**Tags:** ignition79\
**Created:** [January 14, 2021, 7:11pm UTC](https://forum.inductiveautomation.com/t/multiple-pipelines-for-one-tag/42257 "2021-01-14T19:11:28Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![t.bertins](https://avatars.discourse-cdn.com/v4/letter/t/6a8cbe/32.png) [@t.bertins](https://forum.inductiveautomation.com/u/t.bertins)\
**Post date:** [January 14, 2021, 7:11pm UTC](https://forum.inductiveautomation.com/t/multiple-pipelines-for-one-tag/42257/1 "2021-01-14T19:11:28Z")

</div>

In trying to build up multiple call out rotas for maintenance staff. A there are a few tags that have existing alarms with pipelines already attached, is it possible to trigger two pipelines from one alarm? I don’t want to have loads of rostas.

---

<div class="post-metadata">

**Author:** ![paul-griffith](https://sea1.discourse-cdn.com/inductiveautomation/user_avatar/forum.inductiveautomation.com/paul-griffith/32/37249_2.png) [@paul-griffith](https://forum.inductiveautomation.com/u/paul-griffith)\
**Post date:** [January 14, 2021, 7:15pm UTC](https://forum.inductiveautomation.com/t/multiple-pipelines-for-one-tag/42257/2 "2021-01-14T19:15:00Z")

</div>

You can combine the splitter block with the jump block to have a single ‘source’ pipeline that delivers events to multiple downstream pipelines.

---

<div class="post-metadata">

**Author:** ![t.bertins](https://avatars.discourse-cdn.com/v4/letter/t/6a8cbe/32.png) [@t.bertins](https://forum.inductiveautomation.com/u/t.bertins)\
**Post date:** [January 14, 2021, 7:28pm UTC](https://forum.inductiveautomation.com/t/multiple-pipelines-for-one-tag/42257/3 "2021-01-14T19:28:46Z")

</div>

Thank you I will look into this. I see it being a bigger job than anticipated.
