OEE Downtime Table - Merging 2 Downtime Events

Is anyone aware of if it’s at all possible to “merge” 2 downtime events into one using Sepasoft’s OEE Downtime Table?

I know technically you could do this through the value editor by deleting the “running“ tag value state in between the 2 downtime states and then by deleting the second downtime state it would show as though the first downtime state has been in effect that entire duration.

The reason I ask is because it was brought up that we have a user requirement for some of our downtime events that an additional note is required to be entered manually and these downtime events are reoccurring consistently with only a dozen or so seconds between them where the equipment is technically in a “running” state. So realistically the equipment is down that entire time but there are several short downtime events instead of one that encompasses that entirety. Thus leading to a bunch of duplicate work for our end users to carryout instead of just entering one note for the entire block of downtime.