Hey Guys
Please take a look at the popup calendar control. In 7.8.2 if i disable the component i am still able to click on it and change date even with it greyed out.
Bumping this up. I’m still seeing this behavior in 7.8.4.
I’ve verified this even on 7.9.1 as well. I’ll file a bug ticket. Sorry for the inconvenience!